Buftea Laboratory
Laughing in testing, construction safety.
Laboratory for construction analyses and tests.
One of the PORR Romania laboratories is also located within the asphalt plant (ISC Authorisation no.4056/2023; AFER Authorisation AL AL AL series no.610/2019-R2; AFER Authorisation ALTUS series no.741/2024)
Main laboratory activities.
- Carrying out geotechnical investigations through specific laboratory and field tests for the technical analysis of the quality of the materials put in place, carrying out static and dynamic checks on the embankments;
- Assimilation and implementation of European methods for analysing materials;
- Carrying out tests on materials used in road works;
- Studies and tests for the implementation of new materials and performing road technologies;
- Research for the assimilation and implementation of modern methods of materials analysis and design of asphalt mixtures used in the execution of road surfacing.
The laboratory is also authorised for the following profiles:
- ANCFD: Natural aggregates for railway and road works;
- BBABP: Concrete, reinforced concrete, prestressed concrete;
- D: Roads;
- GTF: Geotechnics and subgrade;
- EP: Paving elements (pavers, slabs, kerbs);
- HITIF: Waterproofing, thermal insulation, sound insulation (polystyrene, mineral wool, polyurethane, ETICS, waterproofing materials);
- MBM: Materials for concrete and mortar (aggregates, cement, water for preparing concrete and mortar);
- MD: Road materials;
- MTZ: Mortars for plastering and masonry (mortars, screeds, adhesives for ceramic tiles, plaster and plaster-based plasters, joint mortars for tiles).
- TRAFFIC SAFETY
For more details, please contact our colleague Eugenia Drăgoi at the following e-mail address eugenia.dragoi@porr.ro or phone +40 733 013 759.